27 May 2010

The biggest debacle so far...Lumber

We thought we just had shell out a large sum of money and lumber would automatically appear on our property in conveniently placed locations. Wrong.

The delivery truck arrived yesterday with a forklift designed to be used in warehouse. With racing slicks for tires, the forklift couldn't even get in our driveway before the tires spun out - despite the dry conditions. So we were resolved to placing the materials on the main road at the entrance to our driveway. On the second load, the forklift got stuck in the pea gravel on the road, which resulted in lots of cursing on the part of the delivery guy. We pulled the forklift out with the truck, and he unloaded the rest down the road, well over 200' from our driveway and much more than that from the house. Arggh.

With lumber spread all over the neighborhood, what to do? We called our friendly excavator to come bail us out. In pouring rain, we slung the wood bundles and packed them into our property, turning our driveway into a muddy quagmire in the process. We succeeded in moving the materials without breaking anything or having a heart attack. It's stressful to see several thousand dollars dangling off-balance on the end of strap.

We're headed to Minnesota for 5 days, and good timing. Not much is going to happen until the drivway dries out. We're still on schedule - the framing will begin mid-June, and we just have to get the slab poured before then.



The goods.


Pulling the wimpy forklift out of the gravel. There's hardly a paved driveway in a 50 mile radius and they send this thing?


Jay to the rescue. Lots of $$$ dangling in mid air.


Alls well that ends well.

Feeling Drained

With 100' of perforated pipe and a truckload of gravel, we installed the footer drain around the basement a few days ago. Lots of manual labor moving gravel, but much more satisfying than the work we did the few days afterward...




\



24 May 2010

Slab plumbing

About as exciting as it sounds, but needed to be done. Had drains for a future basement bathroom installed, as well as a floor drain for the utility room.

Also ordered the lumber materials for the house today, should arrive midweek. Right now the weather is our main enemy, consistent small bouts of snow have left the lot a muddy mess. Whether we get the basement slab poured this week will depend heavily on mother nature.

21 May 2010

More power to us...

In a case of cosmic alignment, the stars were in our favor today when somehow the electrician, the power company, and the excavator all showed up and no one got in each other's way. By early afternoon, the concrete walls were infilled with gravel for the slab, power had been run to the house, and the meter base was hooked up along with a couple of outlets for the construction.



The makings of something.



In the trenches.



Finished meter main and outlets.



The last time we'll see this.