Stay in touch with our latest adventures on the new Sawtooth Powder Blog

24 May 2010

Slab plumbing

About as exciting as it sounds, but needed to be done. Had drains for a future basement bathroom installed, as well as a floor drain for the utility room.

Also ordered the lumber materials for the house today, should arrive midweek. Right now the weather is our main enemy, consistent small bouts of snow have left the lot a muddy mess. Whether we get the basement slab poured this week will depend heavily on mother nature.

No comments:

Post a Comment